Showing posts with label Moore's Springs. Show all posts
Showing posts with label Moore's Springs. Show all posts

Monday, April 16, 2012

The Triad MTB Series kicks off this Wednesday Night at MST.



 Come out for a great mid-week test with this first of a 14 race series.

Race Time:  6:15 pm
Expert - 2 1/2 laps
Sport - 2 laps
Beginner - 1 lap

Google Map Link here: Moore's Springs Trails

More information here: TMTB Series

Friday, March 30, 2012

MST is voted Top 10 Trail in NC!

More and more folks are learning about the great mountain bike trails tucked away in the Sauratown Mountains.  We've worked away for about 3 years now and the word is getting out.  Singletrack, a mountain biking website with 1000's of trails from across the country have published a Top 100 list of trails for each state.  We were thrilled when we looked at the list and realized we were ranked #9  ranked #8 ranked #6 in the mountain bike trail hot-bed of NC!



This is all the more exciting for us given recent uptick in the awareness of NC MTB-ing in general.  Bike Magazine have just released their annual Gear Guide Bible and christened NC's Transylvania County and  Pisgah Forest "America's Best Kept Secret". 


Now we find ourselves just a rung down the ladder from such epic trails as Farlow Gap in Brevard.  Without a doubt, western NC has a TON more great trails than we do, but we're off to a good start.  That good start comes from 25 years of mountain biking on my part, knowing a bit about how to build a trail, a great desire to raise the level of recreational opportunities here in the Sauratown's, a great host and land owner in the form of Camp Sertoma, and the hard work and dedication of a wonderful group of volunteers and supporters.


We are well on our way and we're nowhere near done.  We've just had our first big event 'The Doubleshot'  that went down with rave reviews for the passion and hard work of the combined autodrop and MST crews!  Teamwork, partnerships, passion and progress, is what makes it all happen.  Through our continuing events and outreach we'll strive to bring more good things home.  We've already established a great cast of state and local sponsors who support MST as a great place to ride and race.  Much thanks to the local bike shops, including Mock Orange Bikes, Doc Wheelies, Clemmons Bike Shop and Cycle Therapy.  Thanks to local business support from Krankies Coffee, Foothills Brewing, Great Outdoor Provisions, Danbury General Store and Singletree Inn.  Thanks to our great NC sponsors DeFeet and Cane Creek Components and to all the others along the way, like Chamois Buttr' and Sufferfest who have chipped in to make The Sauratown Mountains and Triad NC a better place to bike.  Last but certainly not least, a big thanks to Novant Health and Forsyth Medical Center for their dedication and commitment to community wellness and fitness.  Their support of outreach programs and clinics programed in conjunction with MST will bring more and more NEW people to the trails and onto bikes.  As time goes by we'll build on our current success to make THIS place America's next best kept secret.

Monday, November 28, 2011

New Video

No photos from yesterday's great Trail Build (yet).  But we do have this super new vid from  HotRodMarlin!

Sunday, November 20, 2011

November 19 Trail Build ~ The Spring Creek Crossing

A great day for the Trail Build effort yesterday. Wonderful cold morning around the fire, discussing the day led us out to the new section.  Today was to be about completing the rough cut from the trail end, across Spring Creek, all the way to the connection with the original loop below Mjr. Tom.
Here the guys get at it old school style, carving the final run into the crossing.  At this point, we thought we'd not need the big stones, as the crossing was on bedrock and likely to be stable enough to allow a sustainable crossing.

Once the hand build was going strong, I brought the machine up from where we were going to bring up rocks for the crossing culvert.  This is the rough work by the machine, awaiting hand finishing.

Here we are hand finishing the section above.  This leads across an old drainage ditch and down some fast turns to the crossing.  By this point most of the trail carving has been done and we're starting to look long and hard at the Spring Creek crossing.  Even though we'd put in our hours at this point, few of us wanted to leave the crossing to ride.  So the hardy crew pushed on, went back the the rock pile and started to haul the biggest rocks we could find.


We decided that the creek banks would not withstand repeated crossing so we're building a bridge.  Here we're hauling 400lb rocks up to the crossing to build a culvert across the creek.  

End of the day, the hand built technical section is connected to the machine built sweeps with our best bridge yet.  Made of just 3 bid stones, this crossing is easy on Spring Creek, allowing full flow with room to spare and overflow capacity for floods.  This will ensure water quality, spare the creek banks from repeated treads. It will be a great technical test for riders of all skill levels, easy enough for the moderate rider to cross with comfort while being a real challenge at speed.  Best of all, it is a beautiful example of skilled people working together to blend sustainability, recreation, and craft.  Thanks guys!

Update: Here is a .gps track of my day.  About 5 miles of running around.

Monday, November 14, 2011

Trail Build Day at MST

 Ross getting hands-on with bridge building.





Pat keeping her eye on the boys.